Brixton Metals Drills 554.70m of 1.97 g/t AuEq, Including 135.96m of 1.35 g/t Au, 0.31% Cu, 133.62 g/t Ag or 5.00 g/t AuEq Including 6m of 3.56% Cu, 3.37 g/t Au, 257.77 g/t Ag at its Thorn Project

Brixton Metals Drills 554.70m of 1.97 g/t AuEq, Including 135.96m of 1.35 g/t Au, 0.31% Cu, 133.62 g/t Ag or 5.00 g/t AuEq Including 6m of 3.56% Cu, 3.37 g/t Au, 257.77 g/t Ag at its Thorn Project VANCOUVER, British Columbia, July 15, 2019 (GLOBE NEWSWIRE) —...